National Water Grid
Whenever the water resources gets stretched the idea of national water grid is always discussed. India is a huge nation where droughts and floods occur simultaneously.
HISTORICAL DEVELOPMENT
The idea of national water grid was first discussed by Dr. K.L. Rao in 1972, comprising of 2640 km long range Cauvery link and it involved pumping over head of 550 m.
It was an irrigation cum hydro project and did not have flood control benefits, at was about 1 lac 50 thousand crore.
The project was rejected by CWC for being to expensive.
Then the project of Gculand canal was rejected on grounds of technical feasibility.
In 1980, the ministry of water resources formulated a perspective plan for water resources development and consist in 1982,National Water Development Agency was formed.
Focus on river basins rather on National Water Grid.
The National Commission of Integrated water resources submitted its report highlighting no major need of massive water transfers only intra basin management is needed (exception Cauvery point).
ISSUES
1. Unlike gas water is heavy, transferring it over a large area need pumping (energy) and infrastructure (engineering), this cost is high.
2. In changing climatic conditions its tough to predict where pieplines should go and where further water.
The National Water Grid Scheme is an extension of such schemes. Its components are:
1. Ganga-Cauvery link canal via Son, Narmada, Tapi, Godavari, Krishna and Pennar.
2. Brahmaputra-Ganga link canal through Bangladesh.
3. Narmada canal passing through Gujarat and Rajasthan.
4. The canal from Chambal to central Rajasthan.
5. The link between rivers of Western Ghats to Eastern Ghats.
CONCERNS OF NEIGHBOURING COUNTRIES
There have been concern raised over development of National Water Grid especially in Bangladesh.
There are concerns regarding ecology, environment and crisis can exist.
Building pipelines over large water stressed areas could have the pumping areas under stress.
River linking can also affect the main ecosystem.
There are many small regional schemes which could be extended. Some of already existing basin level schemes are:
(a) Periyar Diversion Scheme
(b) Kurnool – Cuddapah canal
(c) The Indira Gandhi canal
(d) Beas – Sutty link canal
(e) Diversion canal from Ramganga to Ganga.
FEASIBILITY OF NATIONAL WATER GRID
Development and Environmental concerns and concern of neighboring countries should be kept in mind.
A long term goal rather than a hurried approach is needed, for implementing this project.
There is a need to examine feasibility of river links with more data and sound economic analysis of different alternatives.
The master plan should be implemented in phased manner.
The problems of the donor states should be given top most priority.
The in Basin development of water resources should be taken up first before execution of interlinks for interbasin transfer of surplus water to drought prone areas of last phase of plan.